Overview
Advanced Transportation Engineering Design will prepare you to analyse and solve complex transportation problems. You will develop strategies for managing and controlling traffic, identifying safety issues and recommending solutions. You will also analyse and design intersections using the appropriate software. In this unit, you will apply design codes to solve common design problems involving intersection design and pavement design in an ethical and professional manner by considering stakeholders and sustainability requirements. You are required to work, learn and communicate effectively in a professional manner, independently and in project teams. If you are enrolled in distance mode, you will be required to attend a compulsory residential school during the term.
Details
Pre-requisites or Co-requisites
Anti-Requisite: ENEC14016 Traffic and Transportation Engineering
Important note: Students enrolled in a subsequent unit who failed their pre-requisite unit, should drop the subsequent unit before the census date or within 10 working days of Fail grade notification. Students who do not drop the unit in this timeframe cannot later drop the unit without academic and financial liability. See details in the Assessment Policy and Procedure (Higher Education Coursework).
Offerings For Term 1 - 2019
Attendance Requirements
All on-campus students are expected to attend scheduled classes – in some units, these classes are identified as a mandatory (pass/fail) component and attendance is compulsory. International students, on a student visa, must maintain a full time study load and meet both attendance and academic progress requirements in each study period (satisfactory attendance for International students is defined as maintaining at least an 80% attendance record).
Residential Schools
This unit has a Compulsory Residential School for distance mode students and the details are:
Click here to see your Residential School Timetable.
Recommended Student Time Commitment
Each 12-credit Postgraduate unit at CQUniversity requires an overall time commitment of an average of 25 hours of study per week, making a total of 300 hours for the unit.
Class Timetable
Assessment Overview
Assessment Grading
This is a graded unit: your overall grade will be calculated from the marks or grades for each assessment task, based on the relative weightings shown in the table above. You must obtain an overall mark for the unit of at least 50%, or an overall grade of ‘pass’ in order to pass the unit. If any ‘pass/fail’ tasks are shown in the table above they must also be completed successfully (‘pass’ grade). You must also meet any minimum mark requirements specified for a particular assessment task, as detailed in the ‘assessment task’ section (note that in some instances, the minimum mark for a task may be greater than 50%). Consult the University’s Grades and Results Policy for more details of interim results and final grades.
All University policies are available on the CQUniversity Policy site.
You may wish to view these policies:
- Grades and Results Policy
- Assessment Policy and Procedure (Higher Education Coursework)
- Review of Grade Procedure
- Student Academic Integrity Policy and Procedure
- Monitoring Academic Progress (MAP) Policy and Procedure – Domestic Students
- Monitoring Academic Progress (MAP) Policy and Procedure – International Students
- Student Refund and Credit Balance Policy and Procedure
- Student Feedback – Compliments and Complaints Policy and Procedure
- Information and Communications Technology Acceptable Use Policy and Procedure
This list is not an exhaustive list of all University policies. The full list of University policies are available on the CQUniversity Policy site.
Feedback, Recommendations and Responses
Every unit is reviewed for enhancement each year. At the most recent review, the following staff and student feedback items were identified and recommendations were made.
Feedback from Student Course Evaluation
The tutorial and workshop activities were acknowledged to aid learning. This involve hands-on demonstrations on worked examples and suitable exercise on the Industry based software.
The tutorial and workshop sessions will continue to be implemented. The hands-on demonstrations of worked examples will be continued.
Feedback from Student Course Evaluation
The Moodle site format with Icon to aid navigation was reported as the best aspect of the unit. It was graded 4.7 out of 5
The format of the Moodle site with Icon aiding navigation will be implemented across all units delivered by the lecturer.
- Analyse traffic flows and describe the effects of key traffic flow parameters and their inter-relationships
- Apply systematic approaches to conduct capacity analysis and level of service of roadways and intersections
- Evaluate the pavement sublayer materials properties using appropriate Australian guidelines
- Design structural road pavements using appropriate Australian guidelines
- Formulate, plan, manage and complete projects individually or in teams in an ethical and professional manner considering stakeholder requirements and principals of sustainable development
- Demonstrate a professional level of communication and leadership.
The Learning Outcomes for this unit are linked with Engineers Australia's Stage 1 Competency Standard for Professional Engineers.
Alignment of Assessment Tasks to Learning Outcomes
Assessment Tasks | Learning Outcomes | |||||
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | |
1 - Portfolio - 30% | ||||||
2 - Portfolio - 30% | ||||||
3 - Practical Assessment - 10% | ||||||
4 - Examination - 30% |
Alignment of Graduate Attributes to Learning Outcomes
Graduate Attributes | Learning Outcomes | |||||
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | |
1 - Knowledge | ||||||
2 - Communication | ||||||
3 - Cognitive, technical and creative skills | ||||||
4 - Research | ||||||
5 - Self-management | ||||||
6 - Ethical and Professional Responsibility | ||||||
7 - Leadership | ||||||
8 - Aboriginal and Torres Strait Islander Cultures |
Alignment of Assessment Tasks to Graduate Attributes
Assessment Tasks | Graduate Attributes | |||||||
---|---|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
1 - Portfolio - 30% | ||||||||
2 - Portfolio - 30% | ||||||||
3 - Practical Assessment - 10% | ||||||||
4 - Examination - 30% |
Textbooks
Traffic and Highway Engineering, Enhanced SI Edition
Edition: 5 (2019)
Authors: Nicholas J. Garber & Lester A. Hoel
Cengage Learning US
Stamford, CT 06902 Stamford, CT 06902 , USA
ISBN: 9781337631044
Binding: Paperback
Additional Textbook Information
Copies are available to purchase at the CQUni Bookshop here: http://bookshop.cqu.edu.au (search on the Unit code)
IT Resources
- CQUniversity Student Email
- Internet
- Unit Website (Moodle)
- Pavement Design Software CIRCLY
- SIDRA Software
All submissions for this unit must use the referencing style: Harvard (author-date)
For further information, see the Assessment Tasks.
j.egwurube@cqu.edu.au
Module/Topic
Traffic Flow Relationships
Chapter
- Traffic & Highway Engineering by Garber and Hoel SI Edition Chapter 6;
- Guide to Traffic Management Part 2: Traffic Theory (AGTM02-15) Chapter 2
- Guide to Traffic Management Part 2: Traffic Theory (AGTM02-15) Commentary 1 & 2 pages 90 to 92
- Guide to Traffic Management Part 2: Traffic Theory (AGTM02-15) Chapter 7 pages 50 to 72
Events and Submissions/Topic
Module/Topic
Capacity and Level of Service Concepts
Events and Submissions/Topic
Module/Topic
Highway Capacity Analysis
Chapter
-
Highway Capacity Manual (2016) Chapters 12 & 15
- Guide to Traffic Management Part 3: Traffic Studies and Analysis (AGTM03-17) Chapter 4
- Traffic & Highway Engineering by Garber and Hoel SI 5th Edition Chapter 9 pages 465 to 493
Events and Submissions/Topic
Module/Topic
Freeway Capacity Analysis:
Chapter
- Highway Capacity Manual (2016) Chapters10 & 11
- Guide to Traffic Management Part 3: Traffic Studies and Analysis (AGTM03-17) Chapter 4
- Traffic & Highway Engineering by Garber and Hoel SI 5th Edition Chapter 9 pages 447 to 465
Events and Submissions/Topic
Module/Topic
Freeway Capacity Analysis: Merge, Diverge and Weaving Segment
Events and Submissions/Topic
Module/Topic
Chapter
Events and Submissions/Topic
Module/Topic
Signalized & Unsignalised Intersection Capacity Analysis
Chapter
- Guide to Traffic Management Part 3: Traffic Studies and Analysis (AGTM03-17) Chapter 6
- Guide to Traffic Management Part 6: Intersection, Interchanges and Crossing (AGTM06-17) Chapter 4 & 5
- Traffic & Highway Engineering by Garber and Hoel SI 5th Edition Chapter 8 &10
Events and Submissions/Topic
Module/Topic
Flexible Pavement Design I
Events and Submissions/Topic
Module/Topic
Flexible Pavement Design II
Events and Submissions/Topic
Module/Topic
Rigid Pavement Design I
Events and Submissions/Topic
Module/Topic
Rigid Pavement Design II
Events and Submissions/Topic
Module/Topic
Pavement Overlay Design
Events and Submissions/Topic
Module/Topic
Review
Chapter
Events and Submissions/Topic
Module/Topic
Chapter
Events and Submissions/Topic
Module/Topic
Chapter
Events and Submissions/Topic
General Information
- Answer Moodle quiz in the relevant modules.
- Additional unit details are provided in the Moodle unit page
- The required length for any assessment item should not exceed 40 pages excluding appendices
- Obtain all required AUSTROAD guide from https://austroads.com.au/
- Highway Capacity Manual (2016) can be obtained from the CQUniversity library
-
All relevant required Laboratory standard can be obtained from the University Library https://www.saiglobal.com/online/autologin.asp
Communication with Lecturer
-
All unit related questions must be asked through appropriate forums or during the scheduled class
time. No email will be responded for any quarries related to this unit unless those are private in
circumstances. -
All emails related to this unit should have the unit code (ENEC20004) in the subject line. Any email
without unit code in the subject line may not be responded.
Example: ENEC20004: Moodle Quiz
Laboratory Time Table
Detail of the laboratory timetable will be available from unit website separately in Week 2.
Extension Request
Use the official Assessment Extension Request link available in the Unit web-page https://moodle.cqu.edu.au/local/extension/index.php
1 Portfolio
This assessment item relates to the unit learning outcomes 1, 2, 5 and 6. It develops students' ability to understand capacity analysis procedures for both roadways and intersections using current Australian Guidelines and Design Practices. Use of SIDRA software (intersection design software) is highly recommended when applicable.This is an individual submission.
Quizzes (6 Marks):
Complete Moodle quizzes
Roadway Capacity Analysis Task (10 Marks):
Road Authority in Victoria is currently considering to upgrade an existing suburban multilane road to a freeway in Melbourne due to severe traffic delays (based on the public complaints) during peak periods. As a traffic engineer working at Road Authority in Victoria, you were asked to collect data for the existing condition, analyse the existing condition and recommend whether converting the multi lane road to the freeway improves capacity and level of service. Over several months, you collected the following data:
Existing multilane road:
- Lane width of 3.6m (12ft), total lateral clearance 1.8m (6ft) and about 6.25 access points per km (10 points per mile)
- Two lanes per direction, divided multilane road in rolling terrain
- Observed base free flow speed of approximately 80km/hr (50mi/hr)
- Observed directional flow of (3000 + last four digits of your student ID ÷ 10) with corresponding PHF=0.90 and 2% trucks.
- All motorists seem to be commuters or regular facility users.
Proposed freeway data:
- Lane width of 3.6m (12ft), left side lateral clearance 0.9m (3ft) and about 2.5 ramps per km (4 ramps per mile)
- Two lanes per direction, freeway in rolling terrain
- Observed base free flow speed of approximately 110km/hr (70mi/hr)
- Directional traffic flow is expected to increase by 25% including trucks but PHF is expected to remain the same.
- All motorists are expected to be commuters or regular facility users.
Consider the following types for analysis (ignore the costs of converting multilane road to freeway):
- Multilane road- existing case (4 marks)
- Freeway (4 marks)
Also, compare and provide a detailed discussions on analysis outcomes. (2 marks).
Intersection Capacity Analysis Task (14 Marks)
A City Council received a number of complaints about excessive delays at one of their local street intersection during morning peak period at the City Centre. As a traffic engineer working for the City Council, you were tasked with providing the best engineering solution to remedy the problem (if there is a problem). You performed a site visit and the following observations were made:
- The intersection connects two-lane two-way cross-roads at approximately 90 degree angle.
- There are right-turning lanes on North-South road. But site condition is such that one right- turn lane could be added on East-West road too but there is no space for left-turning slip lanes or additional through lanes. Small roundabout could also be considered.
- There were virtually no trucks during morning peak period.
- Currently, the intersection is un-signalised and East-West road needs to GIVE WAY to North- South traffic.
- Speed limit is 60km/hr at all approaches.
- There is not much variation of traffic flow rate within morning peak hour.
- Traffic volumes (veh/hr) during the peak period were observed as follows:
- From South: 200 (left turn), 500 (through) & 100 (right turn)
- From East: 150 (left turn), 100 (through) & 400 (right turn)
- From North: 100 (left turn), 500 (through) & 100 (right turn)
- From West: 150 (left turn), 100 (through) & 200 (right turn)
- No annual traffic growth is expected for foreseeable future.
- Other information can be assumed within Australian Standards and guides.
Consider the following types of intersections for manual analysis and design:
- Un-signalised intersection- existing case (2 marks)
- Un-signalised intersection- modified (2 marks)
- Roundabout (2 marks)
- Signalised intersection (2 marks)
Compare your manual analytical solutions with the outputs from SIDRA. Provide reason/s if there are any variations in the outputs. (4 marks)
Also compare alternative intersection controls and recommend the best intersection type (2 marks).
Week 7 Friday (3 May 2019) 5:00 pm AEST
After 10 working day
The marking matrix shall be based on the content consisting of the following principles. Each sequential step shall be allocated marks proportionately
- Accuracy of Input parameter for each computation step with appropriate unit. Marks will only be awarded for correct input
- Application of accurate methodology with appropriate referencing. Full mark will only be awarded for error free computational steps with appropriate explanation to be understood by an independent person.
- Accuracy of answer with appropriate unit. Zero mark will be awarded with error in either Input or methodology.
- If answers to any preceding steps are inaccurate. Partial mark be awarded for subsequent answers.
Additional information should be obtained from the Moodle Unit web-page
- Analyse traffic flows and describe the effects of key traffic flow parameters and their inter-relationships
- Apply systematic approaches to conduct capacity analysis and level of service of roadways and intersections
- Formulate, plan, manage and complete projects individually or in teams in an ethical and professional manner considering stakeholder requirements and principals of sustainable development
- Demonstrate a professional level of communication and leadership.
- Knowledge
- Communication
- Cognitive, technical and creative skills
- Research
- Self-management
- Ethical and Professional Responsibility
- Leadership
2 Portfolio
This assessment item relates to the unit learning outcomes 3, 4, 5 and 6. It develops students' ability to understand Australian pavement design system, materials and tests and design of alternative pavement configurations (flexible pavements, rigid pavements and structural overlays) using current Australian Guidelines and Design Practices. Use of CIRCLY software (pavement design software) is highly recommended when required.
Quiz (6 Marks)
Complete quizzes online.
Design Task 1: Flexible pavement design (12 marks)
Geometric design, earth moving and subgrade evaluation of a new two-lane two-way road has been recently completed and now it is time for design of pavement in rural Victoria. A new flexible pavement is to be designed and you are tasked to develop flexible pavement alternatives for further consideration. The following are the project specific information supplied by the client (Road Authority in Victoria):
- Two way total AADT=4000+(the last four digits of your student ID)/10
- Pavement design period 30 years.
- Project reliability 95%.
- Lane width= 3.5m.
- Directional distribution 60/40
- Subgrade CBR value = 3 (if the last four digits of your student ID is < 3000), 5 (if the last four digits of your student ID is ≥ 3000 but < 6000) and 7 (if the last four digits of your student ID is ≥ 6000)
- Heavy vehicles = 8% (if the last four digits of your student ID is < 3000), 9% (if the last four digits of your student ID is ≥ 3000 but <6000) and 10% (if the last four digits of your student ID is ≥6000)
- Annual heavy vehicle growth is 1% throughout the design period
- Other required information can be assumed within Australian Standard (Austroads Guides)
- Summarise and calculate required flexible pavement design input parameters (2 marks)
- Design the following flexible pavement alternatives using mechanistic or graphical methods (as applicable, appropriate or preferred!). You need to draw final design drawings for all cases (not to scale is acceptable but indicate all required dimensions and units of measurements). You must discuss/interpret everything you calculate or present.
- Alternative 1: Unbound granular pavement with thin bituminous surfacing (2 marks)
- Alternative 2: Full depth asphalt (E=2500MPa) (2 marks)
- Alternative 3: Asphalt (E=3500MPa) with granular base (E=550MPa) (3 marks)
- Alternative 4: Asphalt (E=2200MPa), granular base (E=550MPa), cemented subbase (E=5000MPa) (3 marks)
Design Task 2: Rigid Pavement design (9 Marks)
For the same road location and information (described above in Design Task 1), Road Authority in Victoria also asked you to develop rigid pavement design alternatives.
- Summarise and calculate required rigid pavement design input parameters (1 marks)
- Design the following rigid pavement alternatives using analytical or graphical methods (as applicable or appropriate or preferred!). You need to draw final design drawings for all cases (not to scale is acceptable but indicate all required dimensions and units of measurements). You must discuss/interpret everything you calculate or present.
- Alternative 1: PCP pavement without concrete shoulder (4 marks)
- Alternative 2: CRCP pavement with concrete shoulder (4 marks)
Design Task 3: Design of Flexible Asphalt Overlay (3 Marks)
A homogeneous section of a cracked asphalt surfaced granular pavement is situated in Melbourne where the WMAPT is 24°C. As the existing asphalt is cracked, it is proposed to mill 25 mm from the existing 50 mm thick asphalt prior to asphalt overlay. The following characteristic values were calculated from deflectograph deflection testing undertaken at a pavement temperature of 25 °C:
- Measured Characteristic Deflection at 25°C = 0.87 mm
- Measured Characteristic Curvature at 25°C = 0.30 mm.
Based on experience, the client (Road Authority in Victoria) advised that the designer considered that there was no need to apply a Seasonal Moisture Correction Factor to these measured deflections and curvatures. The design traffic loading (ESA) for this section is the same as described above (Design Task 1).
- Design asphalt overlay on asphalt surfaced granular pavement using design charts. You need to draw final design drawings (not to scale is acceptable but indicate all required dimensions and units of measurements). You must discuss/interpret everything you calculate (6 marks)
Week 12 Friday (7 June 2019) 5:00 pm AEST
10 working days
The marking matrix shall be based on the content consisting of the following principles. Each sequential step shall be allocated marks proportionately
- Accuracy of Input parameter for each computation step with appropriate unit. Marks will only be awarded for correct input
- Application of accurate methodology with appropriate referencing. Full mark will only be awarded for error free computational steps with appropriate explanation to be understood by an independent person.
- Accuracy of answer with appropriate unit. Zero mark will be awarded with error in either Input or methodology.
- If answers to any preceding steps are inaccurate. Partial mark be awarded for subsequent answers.
Additional information should be obtained from the Moodle Unit web-page
- Evaluate the pavement sublayer materials properties using appropriate Australian guidelines
- Design structural road pavements using appropriate Australian guidelines
- Formulate, plan, manage and complete projects individually or in teams in an ethical and professional manner considering stakeholder requirements and principals of sustainable development
- Demonstrate a professional level of communication and leadership.
- Knowledge
- Communication
- Cognitive, technical and creative skills
- Research
- Self-management
- Ethical and Professional Responsibility
- Leadership
3 Practical Assessment
- You will complete the practical activities and the laboratory report as a team.
- Each team should check their schedule timetable as shown in Moodle
- All teams will upload a single team report due as per the Unit Profile.
- The required practical activities are as follows
- Preparation of disturbed soil sample for testing
- Soil Compaction and density test AS1289.5.2.2017
- Determination of Permanent deformation of unbound granular materials under undrained contions AGTP-T053-07
- Determination of Resilience Modulus characteristics of unbound granular materials under undrained contions AGTP-T053-07
- Lime Saturation Point of Soil (pH Method) RC131.01 2018
Review/Exam Week Tuesday (11 June 2019) 5:00 pm AEST
10 working days
The marking matrix shall be based on the content consisting of the following principles. Each sequential step shall be allocated marks proportionately
- Accuracy of Input parameter for each computation step with appropriate unit. Marks will only be awarded for correct input
- Application of accurate methodology with appropriate referencing. Full mark will only be awarded for error free computational steps with appropriate explanation to be understood by an independent person.
- Accuracy of answer with appropriate unit. Zero mark will be awarded with error in either Input or methodology.
- If answers to any preceding steps are inaccurate. Partial mark be awarded for subsequent answers.
Additional information should be obtained from the Moodle Unit web-page
- Evaluate the pavement sublayer materials properties using appropriate Australian guidelines
- Knowledge
- Communication
- Cognitive, technical and creative skills
- Research
- Self-management
- Ethical and Professional Responsibility
- Leadership
Examination
Calculator - all non-communicable calculators, including scientific, programmable and graphics calculators are authorised
As a CQUniversity student you are expected to act honestly in all aspects of your academic work.
Any assessable work undertaken or submitted for review or assessment must be your own work. Assessable work is any type of work you do to meet the assessment requirements in the unit, including draft work submitted for review and feedback and final work to be assessed.
When you use the ideas, words or data of others in your assessment, you must thoroughly and clearly acknowledge the source of this information by using the correct referencing style for your unit. Using others’ work without proper acknowledgement may be considered a form of intellectual dishonesty.
Participating honestly, respectfully, responsibly, and fairly in your university study ensures the CQUniversity qualification you earn will be valued as a true indication of your individual academic achievement and will continue to receive the respect and recognition it deserves.
As a student, you are responsible for reading and following CQUniversity’s policies, including the Student Academic Integrity Policy and Procedure. This policy sets out CQUniversity’s expectations of you to act with integrity, examples of academic integrity breaches to avoid, the processes used to address alleged breaches of academic integrity, and potential penalties.
What is a breach of academic integrity?
A breach of academic integrity includes but is not limited to plagiarism, self-plagiarism, collusion, cheating, contract cheating, and academic misconduct. The Student Academic Integrity Policy and Procedure defines what these terms mean and gives examples.
Why is academic integrity important?
A breach of academic integrity may result in one or more penalties, including suspension or even expulsion from the University. It can also have negative implications for student visas and future enrolment at CQUniversity or elsewhere. Students who engage in contract cheating also risk being blackmailed by contract cheating services.
Where can I get assistance?
For academic advice and guidance, the Academic Learning Centre (ALC) can support you in becoming confident in completing assessments with integrity and of high standard.