CQUniversity Unit Profile
COIT12208 ICT Project Management
ICT Project Management
All details in this unit profile for COIT12208 have been officially approved by CQUniversity and represent a learning partnership between the University and you (our student).
The information will not be changed unless absolutely necessary and any change will be clearly indicated by an approved correction included in the profile.
Corrections

Unit Profile Correction added on 30-04-20

The Term 1 exam will be replaced with a take home exam due to COVID19 restrictions. Further details will be available on the unit website. Learning outcomes assessed will be unchanged.

General Information

Overview

In this unit, you will learn key concepts of Information and Communication Technology project management from both a traditional and Agile perspective. You will apply project management principles and use project management software with the aim of delivering successful projects. Industry standards, quality assurance, professional ethics, social, cultural and legal issues relevant to the theories and principles of project management will also be covered.

Details

Career Level: Undergraduate
Unit Level: Level 2
Credit Points: 6
Student Contribution Band: 8
Fraction of Full-Time Student Load: 0.125

Pre-requisites or Co-requisites

Pre-requisite: COIT11226 Systems Analysis. Anti-requisite: If you have successfully completed COIS13064 ICT Project Management, then you should not take this unit.

Important note: Students enrolled in a subsequent unit who failed their pre-requisite unit, should drop the subsequent unit before the census date or within 10 working days of Fail grade notification. Students who do not drop the unit in this timeframe cannot later drop the unit without academic and financial liability. See details in the Assessment Policy and Procedure (Higher Education Coursework).

Offerings For Term 1 - 2020

Brisbane
Cairns
Melbourne
Online
Rockhampton
Sydney
Townsville

Attendance Requirements

All on-campus students are expected to attend scheduled classes – in some units, these classes are identified as a mandatory (pass/fail) component and attendance is compulsory. International students, on a student visa, must maintain a full time study load and meet both attendance and academic progress requirements in each study period (satisfactory attendance for International students is defined as maintaining at least an 80% attendance record).

Class and Assessment Overview

Recommended Student Time Commitment

Each 6-credit Undergraduate unit at CQUniversity requires an overall time commitment of an average of 12.5 hours of study per week, making a total of 150 hours for the unit.

Class Timetable

Bundaberg, Cairns, Emerald, Gladstone, Mackay, Rockhampton, Townsville
Adelaide, Brisbane, Melbourne, Perth, Sydney

Assessment Overview

1. Presentation
Weighting: 15%
2. Written Assessment
Weighting: 35%
3. Examination
Weighting: 50%

Assessment Grading

This is a graded unit: your overall grade will be calculated from the marks or grades for each assessment task, based on the relative weightings shown in the table above. You must obtain an overall mark for the unit of at least 50%, or an overall grade of ‘pass’ in order to pass the unit. If any ‘pass/fail’ tasks are shown in the table above they must also be completed successfully (‘pass’ grade). You must also meet any minimum mark requirements specified for a particular assessment task, as detailed in the ‘assessment task’ section (note that in some instances, the minimum mark for a task may be greater than 50%). Consult the University’s Grades and Results Policy for more details of interim results and final grades.

Previous Student Feedback

Feedback, Recommendations and Responses

Every unit is reviewed for enhancement each year. At the most recent review, the following staff and student feedback items were identified and recommendations were made.

Feedback from Student feedback

Feedback

Distance students requested weekly interactive sessions

Recommendation

Weekly interactive sessions should be held that distance students can attend.

Feedback from Student feedback

Feedback

Students requested more integrated tutorials and less duplication of content from other units.

Recommendation

More practical activities related to the lecture content should be developed for the tutorials and an audit of content should take place to identify content duplicated in other units.

Unit Learning Outcomes
On successful completion of this unit, you will be able to:
  1. Describe the activities and importance of both traditional and agile project management
  2. Apply common project planning, scheduling, budgeting and resource management tools and procedures
  3. Evaluate project status and recommend appropriate corrective action where necessary
  4. Assess the ethical, social, cultural and legal impacts of projects on diverse stakeholders.

Australian Computer Society (ACS) recognises the Skills Framework for the Information Age (SFIA). SFIA is in use in over 100 countries and provides a widely used and consistent definition of ICT skills. SFIA is increasingly being used when developing job descriptions and role profiles.

ACS members can use the tool MySFIA to build a skills profile at https://www.acs.org.au/professionalrecognition/mysfia-b2c.html

This unit contributes to the following workplace skills as defined by SFIA. The SFIA code is included:

  • Business Analysis (BUAN)
  • Project Management (PRMG)
  • Change Management (CHMG)
  • Requirements Definition and Management (REQM)
  • Information Systems Co-ordination (ISCO)
  • Business Process Improvement (BPRE)
  • Methods and Tools (METL)
  • Programming/software development (PROG)

Alignment of Learning Outcomes, Assessment and Graduate Attributes
N/A Level
Introductory Level
Intermediate Level
Graduate Level
Professional Level
Advanced Level

Alignment of Assessment Tasks to Learning Outcomes

Assessment Tasks Learning Outcomes
1 2 3 4
1 - Presentation - 15%
2 - Written Assessment - 35%
3 - Examination - 50%

Alignment of Graduate Attributes to Learning Outcomes

Graduate Attributes Learning Outcomes
1 2 3 4
1 - Communication
2 - Problem Solving
3 - Critical Thinking
4 - Information Literacy
5 - Team Work
6 - Information Technology Competence
7 - Cross Cultural Competence
8 - Ethical practice
9 - Social Innovation
10 - Aboriginal and Torres Strait Islander Cultures

Alignment of Assessment Tasks to Graduate Attributes

Assessment Tasks Graduate Attributes
1 2 3 4 5 6 7 8 9 10
1 - Presentation - 15%
2 - Written Assessment - 35%
3 - Examination - 50%
Textbooks and Resources

Textbooks

Prescribed

PMI-ACP Project Management Institute Agile Certified Practitioner Exam Study Guide

(2018)
Authors: J. Ashley Hunt
Sybex, John Wiley & Sons
Indianapolis Indianapolis , Indiana
ISBN: 978-1-119-43446-7
Binding: eBook
Prescribed

SUCCESSFUL PROJECT MANAGEMENT 7TH EDN

Edition: 7th (2018)
Authors: Gido, J & Clements, JP
Cengage Learning
Boston Boston , MA , USA
ISBN: 9781337095471
Binding: Hardcover

Additional Textbook Information

  • The library contains an online fulltext version of the PMI-ACP Project Management Institute Agile Certified Practitioner Exam Study Guide
  • Please take the exam type into consideration when you purchase textbooks. Copies can be purchased at the CQUni Bookshop here: http://bookshop.cqu.edu.au (search on the Unit code)
Visual Paradigm supports CQUniversity with online diagramming software for the drawing UML, Flowchart, Mindmap, BPMN, ArchiMate and more, under the Academic Partner Program.

IT Resources

You will need access to the following IT resources:
  • CQUniversity Student Email
  • Internet
  • Unit Website (Moodle)
  • Webcam and headset
  • Access to Microsoft Visio
  • Access to Microsoft Office
  • Access to Microsoft Project 2016.
Referencing Style

All submissions for this unit must use the referencing style: Harvard (author-date)

For further information, see the Assessment Tasks.

Teaching Contacts
Jamie Shield Unit Coordinator
j.shield@cqu.edu.au
Schedule
1 Project Management Concepts Begin Date: 09 Mar 2020

Module/Topic

Chapter

  • Gido, J 2018. Successful project management. 7th ed., Cengage.
    Chapter 1 Project Management Concepts
  •  Hunt, J 2018. PMI-ACP project management institute agile certified practitioner exam study guide. Chapter 1 Agile Foundations

Events and Submissions/Topic

2 Adaptive Planning: Backlogs & Sprints Begin Date: 16 Mar 2020

Module/Topic


Chapter

  • 2 Scrum and eXtreme Programming (XP) (Hunt 2018)
  • 6 Agile Estimation and Planning (Hunt 2018)

Events and Submissions/Topic

3 Adaptive Development: User stories & Taskboards Begin Date: 23 Mar 2020

Module/Topic


Chapter

  • 4 Agile Initiation and Stakeholder Engagement (Hunt 2018)
  • 7 Effective Team Performance on Agile Projects (Hunt 2018)

Events and Submissions/Topic

4 Predictive Scope & Activity Sequencing Begin Date: 30 Mar 2020

Module/Topic


Chapter

  • 4 Defining Scope, Quality, Responsibility, and Activity Sequence (Gido 2018)

Events and Submissions/Topic

Adaptive PM Presentation Due: Week 4 Friday (3 Apr 2020) 11:59 pm AEST
5 Predictive Scheduling using the Critical Path Method Begin Date: 06 Apr 2020

Module/Topic

Chapter

  • 5 Developing the Schedule (Gido 2018)

Events and Submissions/Topic


Vacation Week Begin Date: 13 Apr 2020

Module/Topic

Chapter

Non-teaching week

Events and Submissions/Topic


6 DevOps Begin Date: 20 Apr 2020

Module/Topic

Chapter

  • 3 Key Aspects of Additional Agile Methodologies (Hunt 2018)

Events and Submissions/Topic


7 Resource Management and Predictive Estimation: COCOMO & PERT Begin Date: 27 Apr 2020

Module/Topic

Chapter

  • 6 Resource Utilization (Gido 2018)

Events and Submissions/Topic


8 Cost & Earned Value Management Begin Date: 04 May 2020

Module/Topic

Chapter

  • 7 Determining Costs, Budget and Earned Value (Gido 2018)

Events and Submissions/Topic


9 Quality & Stakeholder Management Begin Date: 11 May 2020

Module/Topic

Chapter

  • 12 Project Communication and Documentation (Gido 2018)

Events and Submissions/Topic


10 Risk Management Begin Date: 18 May 2020

Module/Topic

Chapter

  • 8 Managing Risk (Gido 2018)

Events and Submissions/Topic


11 Organisational Structures Begin Date: 25 May 2020

Module/Topic

Chapter

  • 13 Project Management Organizational Structures (Gido 2018)

Events and Submissions/Topic

Predictive PM Due: Week 11 Friday (29 May 2020) 11:45 pm AEST
12 Exam Review Begin Date: 01 Jun 2020

Module/Topic


Chapter


Events and Submissions/Topic

Review/Exam Week Begin Date: 08 Jun 2020

Module/Topic

Chapter

Events and Submissions/Topic

Exam Week Begin Date: 15 Jun 2020

Module/Topic

Chapter

Events and Submissions/Topic

Term Specific Information

Unit Coordinator: Jamie Shield, Cairns, j.shield@cqu.edu.au,
Office: 07 4037 4750

Assessment Tasks

1 Presentation

Assessment Title
Adaptive PM Presentation

Task Description

The aim of this assignment is for you to gain adaptive project management experience. You will act as an adaptive project manager for an ICT project. You will need to perform tasks such as the following:

  • Create and maintain a product backlog
  • Develop a sprint plan
  • Manage quality and risk issues and
  • Present a sprint review.

You may complete this assignment alone or in a group of up to three people. Distance students who are working on the assignment alone must still perform their presentation live either face-to-face or using Zoom to at least one other student.

1. Update plan to reflect project progress

You will be provided with a rough project plan and development files of an ICT project representing progress made in the project at the end of its first sprint, that is, Sprint 1. You will need to create a plan using the specified project management tool to reflect the project status at the end of Sprint 1.

2. Create Sprint 2 Plan

In Week 4, you will submit your plan to the unit website. You will not receive formal feedback for this plan until after your presentation.

3. Present Sprint 2 Review

In Week 5, you will be provided with a new set of development files. To prepare for your presentation, you will need to update the plan that you submitted in Week 4 to reflect the progress made in the project.

In Week 6, you will present a review of Sprint 2.

Each team member should talk for between 3 to 5 minutes each.

Oncampus student will present their sprint reviews in the Week 6 class. The lecturer might record presentations for moderation purposes. Groups must be prepared to present even if one or more team members are not present at the Week 6 class. Students who do not present will receive 0 marks for the presentation components of the assessment.

Distance students will present their sprint reviews in an online Zoom session. Distance students who are working in groups can present their components of their sprint review to their group. Distance students who are working alone must form groups of at least two for the presentation. You will present your sprint reviews to your group members and record the presentation including the video feeds of all group members and your shared desktops. In Week 6, you will submit a link to a cloud hosted copy of your video.

Plagiarism

Sharing ideas about project management concepts and techniques between groups is encouraged. Any ideas you reuse should be referenced. Sharing of project management files or copying, for example, user stories, subtasks, issues or controls, between groups will be considered plagiarism. If you are in doubt about whether you can share something, first obtain email consent from your lecturer.

Plagiarism will dealt with according to University policy. Plagiarism penalties and academic misconduct charges may apply to all group members. Your assignment might be assigned a zero grade or reported for further action.

Teams

You may complete this assignment alone or in a group of up to three people. You will form your own teams.

Alternative Project

With the written permission of the unit coordinator, you may work on an alternative project for, for example, your work or hobby.

Further details are provided on the unit website.


Assessment Due Date

Week 4 Friday (3 Apr 2020) 11:59 pm AEST

This assignment has components due in Weeks 4 and 6.


Return Date to Students

Week 7 Friday (1 May 2020)

Informal feedback will be provided during in-class presentations. Your marks and formal feedback will be returned in Week 7.


Weighting
15%

Assessment Criteria

The Stage Presence criteria will be marked individually. Your mark for Presentation content will be marked individually but may be affected by your entire groups’ Presentation content. Subject to moderation, students in a group will usually receive the same mark for all other criteria.

The following table is indicative of the actual marking criteria. The criteria are equally weighted. Please check the unit website for updates.

100% 75% 50% 25% 0%
Backlog Your backlog contains appropriate, high value user stories and is appropriately prioritised. A significant user story missing or minor prioritisation errors. Multiple user stories missing or major prioritisation errors. Not implemented
User Stories High quality user stories that adhere to Moore’s template and INVEST, e.g. independent, valuable for users & testable via excellent acceptance criteria. Estimated effort & value are included. At least 5 quality user stories for individuals; 8 for pairs & 10 for triplets. Some user stories are lifestyle specific, e.g. “testing” a feature. Not implemented.
Sprint plans Maximises value through prioritisation. Excellent velocity management. Poor sprint plan user story choice. Not implemented
Taskboard Excellent decomposition of user stories into subtasks that focus on developers. State management of subtasks accurately reflect the project status. Vague or ambiguous subtasks. Multiple subtasks left in incorrect states. Not implemented
Issues Excellent identification of quality & risk issues & specification of realistic controls. Issues and controls are specified .... Not implemented
Stage presence Excellent stage presence including well prepared, stands up straight, loud clear voice, good eye contact, does not speak too fast or too slow; appropriate use of cue cards: does not read; appropriate use of time. Excellent gestures, e.g. precision grip & and lack of adaptor gestures (e.g. no fidgeting); excellent use of space, e.g. moves around stage but does not pace.
Presentation content Excellent walkthrough of user story acceptance criteria. Excellent presentation of quality project management plan using the PM tool. Poor walkthrough of acceptance criteria. Poor discussion or presentation of scope management: backlogs, size estimates, taskboards, or burndown chart. Poor discussion of quality and risk management.


Referencing Style

Submission
Online

Submission Instructions
In Week 4, you are to submit your project plan using the file format described on the unit website to the unit website. All team members should be added as Members of the project plan. All group members must submit. Oncampus student will present their sprint reviews in the Week 6 class. In Week 6, distance students are to submit a link to videos containing their presentations. All distance students must submit. Incomplete submissions, for example, due to insufficient permissions or corrupt files, might not be marked or a late penalty might be applied.

Learning Outcomes Assessed
  • Describe the activities and importance of both traditional and agile project management
  • Assess the ethical, social, cultural and legal impacts of projects on diverse stakeholders.


Graduate Attributes
  • Communication
  • Information Literacy
  • Team Work

2 Written Assessment

Assessment Title
Predictive PM

Task Description

The aim of this assignment is to allow you to gain predictive project management experience. You are to complete predictive project management tasks for a collection of project scenarios and simulations.

You will develop and manage project scope, schedule, integration, human resources, communications, stakeholder, quality and risk using predictive techniques and tools, for example, MS Project and MS Excel. You will create recommendations to proactively manage or correct project issues. You will complete scenarios such as the following:

  • Model project scenarios in MS Project using concepts and techniques such as milestones, summary tasks, progressive feed, lead times, lag, slack, hammock tasks, 2-levelled WBSs and rolling wave elaboration on a WBS
  • Manage scheduling using the Critical Path Method (CPM).
  • Perform resource levelling and project crashing using MS Project
  • Calibrate a COCOMO model to predict the duration of a project
  • Apply PERT to provide better estimate of the average duration and variation in duration of a project
  • Manage costs by applying Earned Value Management (EVM) techniques in MS Project and interpreting the results
  • Manage quality using techniques such as Fault Tree Analysis (FTA)
  • Interpret defect run charts, escaped defect control charts and Pareto charts
  • Calculating risk leverage factors to assess the cost effectiveness of risk responses
  • Create or interpret a decision tree and calculate expected monetary values (EMV not EVM) to assess risk response options and
  • Play project management simulations

The scenarios will be distributed to you in two quizzes. Quiz 1 will provide feedback before the due date. You may have unlimited attempts at Quiz 1 until the deadline. You may submit Quiz 2 as many times as you like: only the last submission will be marked. Both quizzes will be available by Week 4. Quiz 1 is worth 20% and Quiz 2 is worth 15%.

Plagiarism

The assignment is individually assessed. Sharing of any files related to this assignment will be considered plagiarism. All your submissions may be checked for plagiarism.


Assessment Due Date

Week 11 Friday (29 May 2020) 11:45 pm AEST

Both quizzes are due in Week 11.


Return Date to Students

Week 12 Friday (5 June 2020)

Your marks and feedback for both quizzes will be returned in Week 12 when the moderation process is complete. Any feedback you receive prior to the moderation process might change.


Weighting
35%

Assessment Criteria

The assignment is individually assessed. You will be assessed on aspects such as the following. Most of the criteria will be weighted similarly. Criteria such as those related to Scope and schedule management in MS Project (≈5 scenarios); and Managing costs using EVM (≈4 scenarios) will be more heavily weighted.

Develop MS Project files using concepts such as milestones, summary tasks Names adhere to Biafore (Chp. 4, 2010). Biafore, B 2010, Microsoft Project 2010: The Missing Manual, Pogue, O’Reilly.
Improve the structure and simplify MS Project dependencies using summary tasks and milestones. Appropriate use of summary tasks, milestones and predecessor structures
Perform scope and schedule management by implementing progressive feed, lead times, lag, slack and hammock tasks applying techniques such as developing 2-levelled WBSs, performing rolling wave elaboration on a WBS and in MS Project. Correctly implemented in this unit’s style as presented in the unit material using MS Projects milestones and predecessor types
Manage scheduling using the Critical Path Method (CPM). Correct application using this unit’s style
Perform resource levelling and project crashing using MS Project Correct application of MS Project techniques. Project crashes are performed cost effectively.
Calibrate a COCOMO model to predict the duration of a project Correct calculation using the simplified model presented in the unit materials
Apply PERT to provide better estimate of the average duration and variation in duration of a project. Correct application of the MS Project techniques and formulae presented in the unit materials.
Manage costs by applying Earned Value Management (EVM) techniques in MS Project and interpreting the results. Correct application of the MS Project techniques and formulae presented in the unit materials. Appropriate interpretation of the results.
Manage quality using techniques such as Fault Tree Analysis (FTA) Correct analysis of the scenario and calculations
Interpret defect run charts, escaped defect control charts and Pareto charts Appropriate interpretation
Calculating risk leverage factors to assess the cost effectiveness of risk responses Correct calculations
Create or interpret a decision tree and calculate expected monetary values to assess risk response options Correct analysis of the scenario. Correct calculations. Appropriate interpretation of results.
Play project management simulations Quality reflections on task management strategies with insightful integration of unit materials


Referencing Style

Submission
Online

Submission Instructions
The quizzes need to be completed on the unit website. You will upload files and type reflections inside the quizzes.

Learning Outcomes Assessed
  • Apply common project planning, scheduling, budgeting and resource management tools and procedures
  • Evaluate project status and recommend appropriate corrective action where necessary


Graduate Attributes
  • Communication
  • Problem Solving
  • Critical Thinking
  • Information Literacy
  • Information Technology Competence

Examination

Outline
Complete an invigilated examination

Date
During the examination period at a CQUniversity examination centre

Weighting
50%

Length
120 minutes

Minimum mark or grade
You are required to achieve a mark of at least 40% in the examination and 50% overall to pass the unit.

Exam Conditions
Open Book

Materials
Dictionary - non-electronic, concise, direct translation only (dictionary must not contain any notes or comments).
Calculator - non-programmable, no text retrieval, silent only
Academic Integrity Statement

As a CQUniversity student you are expected to act honestly in all aspects of your academic work.

Any assessable work undertaken or submitted for review or assessment must be your own work. Assessable work is any type of work you do to meet the assessment requirements in the unit, including draft work submitted for review and feedback and final work to be assessed.

When you use the ideas, words or data of others in your assessment, you must thoroughly and clearly acknowledge the source of this information by using the correct referencing style for your unit. Using others’ work without proper acknowledgement may be considered a form of intellectual dishonesty.

Participating honestly, respectfully, responsibly, and fairly in your university study ensures the CQUniversity qualification you earn will be valued as a true indication of your individual academic achievement and will continue to receive the respect and recognition it deserves.

As a student, you are responsible for reading and following CQUniversity’s policies, including the Student Academic Integrity Policy and Procedure. This policy sets out CQUniversity’s expectations of you to act with integrity, examples of academic integrity breaches to avoid, the processes used to address alleged breaches of academic integrity, and potential penalties.

What is a breach of academic integrity?

A breach of academic integrity includes but is not limited to plagiarism, self-plagiarism, collusion, cheating, contract cheating, and academic misconduct. The Student Academic Integrity Policy and Procedure defines what these terms mean and gives examples.

Why is academic integrity important?

A breach of academic integrity may result in one or more penalties, including suspension or even expulsion from the University. It can also have negative implications for student visas and future enrolment at CQUniversity or elsewhere. Students who engage in contract cheating also risk being blackmailed by contract cheating services.

Where can I get assistance?

For academic advice and guidance, the Academic Learning Centre (ALC) can support you in becoming confident in completing assessments with integrity and of high standard.

What can you do to act with integrity?